We have done research at four different levels
Federal, State, County and an International Airport.
The following is a brief description of the savings:
Federal:
GSB-88 (fog seal) will extend the life of a new
asphalt pavement 3.5 years. The cost of GSB-88 is
$0.18 per year for those 3.5 years or the asphalt
cost would be $0.31 if no preventive maintenance had
been done. The cost savings for 1 mile of road per
year would be $1,800 for the 3.5 years that the
GSB-88 was extending the life of the overlay.
State:
In this case the costs were similar only the
time was 4 years. This makes the savings $2,100 for
the 4 years of extra life that the GSB-88 gave the
asphalt overlay.
County:
Because the overlay was of an inadequate design
to start with the extra life was 3.5 years and the
savings was closer to $1800.
International Airport:
The results of these projects varied between 3
and 5 years. If we use the conservative time of 3
years the yearly saving is $2,900 because the higher
standards required.